My Jabiru Project

Week Seven

When it is finished it will look like this:

Specifications & Performance


Trial Fit Doors

Fit Hinges to Elevator

Trim Tab Fitted to Elevator

Elevator End Plug Bonded Into Place

Horizontal Stabiliser End Cap Bonded Into Place

Elevator Hinge Attached to Horizontal Stabiliser

Complete Elevator Assembly Attached to Horizontal Stabiliser

Mid Build Shed Clean

Mid Build Shed Clean

Hand Tools

Power Tools

Work Bench

Resin, Paint, Filler etc

The Kitchen

Aileron Stops Fitted

Control Column Forward Stop Flocked Into Place

Elevator & Trim Cable Mechanism

Elevator End Plug Glassed

Trial Fit Fin & Screw

Fin Flocked Into Place & Screwed

Fin/Fin Post Glassed

Static Tube Fitted

Trial Fit Strobe
 

End of week seven