
Bond Flap Plate Into Position |

Bond Rear Seat Belt Gusset |

Strengthen Seat Back For Aileron Cable Bracket |

Re-Fit Seat Pan Over Fuel Header Tank |

Brake Lines Fitted |

Prepare Door For Trial Fitting |

Painted Nose Leg |

Assemble Nose Leg & Flock Bushes Into Place |

Tool Box Under Left Seat |

Control Panel Upholstered |

Wheels & Brakes Attached |

Stainless Steel Firewall Folded & Drilled |

Stainless Steel Firewall Riveted Into Place |

Trial Fit Nose Leg |

Nose Leg Bracket Bolted Into Place |

Internal Nose Leg Bracket Supports |