My Jabiru Project

Week Five

When it is finished it will look like this:

Specifications & Performance


Bond Flap Plate Into Position

Bond Rear Seat Belt Gusset

Strengthen Seat Back For Aileron Cable Bracket

Re-Fit Seat Pan Over Fuel Header Tank

Brake Lines Fitted

Prepare Door For Trial Fitting

Painted Nose Leg

Assemble Nose Leg & Flock Bushes Into Place

Tool Box Under Left Seat

Control Panel Upholstered

Wheels & Brakes Attached

Stainless Steel Firewall Folded & Drilled

Stainless Steel Firewall Riveted Into Place

Trial Fit Nose Leg

Nose Leg Bracket Bolted Into Place

Internal Nose Leg Bracket Supports

End of week five

Week 1 Week 2 Week 3 Week 4 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17

Click Here to Contact Me