My Jabiru Project

Week 10

When it is finished it will look like this:

Specifications & Performance


Radio Button Installed & Wired

L/H Microphone & Headphone Jacks Installed & Wired

R/H Microphone & Headphone Jacks Installed & Wired

L/H Door Window Bonded In

R/H Door Window Bonded In
Sanding

Sanding

Sanding


Right Side Filler Undercoat

Left Side Filler Undercoat
Sanding

Sanding

Sanding


Right Side After Sanding Back

Left Side After Sanding Back

R/H Main Leg Faired

L/H Main Leg Faired
Sanding

Filling

Sanding

End of week 10